Connect with us

Rehoboth Beach

Rehoboth Beach drag volleyball tradition ends

Labor Day contest scrapped 34 years after debut

Published

on

A group shot at one of the previous drag volleyball matches. (Photo courtesy of Brent Minor)

Organizers of the annual Labor Day weekend drag volleyball event in Rehoboth Beach, Del., announced the tradition has been canceled. 

The event pitted two teams of gay guys in drag against each other, which organizers insisted on keeping “just for fun,” drawing thousands of spectators each year. The event celebrated its 25th anniversary in 2013; it was canceled the last two years due to COVID.

The event’s Facebook page announced the cancellation: “Some sad news to share. Due to numerous circumstances, it seems as if our last Drag Volleyball game in Rehoboth has already been played. We are sorry to disappoint you and put an end to this Rehoboth end of summer tradition. Thanks for all of your support throughout the years.”

Forrest Park, one of the original players, told the Blade in 2013 that it started with simple and casual pick-up volleyball games on Poodle Beach at the end of the boardwalk in 1988. An older gay man Park only knew as “Mother” owned the net and gave it to Park, the same net they used until it wore out in 2011. All the players — nine on each team — had drag names, which they use with each other throughout the summer. Each team picked a theme for the year and performed sometimes elaborate dance routines during breaks from the game.

Advertisement
FUND LGBTQ JOURNALISM
SIGN UP FOR E-BLAST

Rehoboth Beach

CAMP Rehoboth hires new executive director

Dr. Robin Brennan’s background includes healthcare, fundraising roles

Published

on

Dr. Robin Brennan

CAMP Rehoboth, the Delaware LGBTQ community center, on Monday announced Dr. Robin Brennan as the organization’s new executive director.  

Brennan, who is relocating full time to Rehoboth Beach with her wife and daughter, will start on March 23. The position opened up following the retirement of Kim Leisey after more than two years in the role.

Brennan’s background is in health systems. At Nemours Children’s Health in Wilmington, Del., she held senior roles in evaluation, population health, and DEI education, according to a CAMP Rehoboth statement. Most recently, she served as vice president and Chief Diversity and Inclusion Officer at Redeemer Health. Brennan is an experienced fundraiser, according to the statement.

“After conducting a comprehensive national search, the Board of Directors selected Robin because of her depth of leadership experience, her fundraising acumen and her overall joyful, focused approach,” said Leslie Ledogar, president of the CAMP Rehoboth board of directors and chair of the Executive Director Search Committee. “The fact that core to her leadership is her belief that community well-being is inseparable from access to health, culture, education and the arts – an approach that mirrors CAMP Rehoboth’s holistic mission – makes Robin the exact next person to lead CAMP Rehoboth today and into the future.” 

“I am deeply honored to serve as CAMP Rehoboth’s executive director as we enter an exciting new chapter,” said Brennan. “I was drawn to CAMP Rehoboth because of its unwavering mission, deep roots in the community, and the meaningful role it plays in bringing people together. I look forward to meeting members of the community, listening to their stories, and building meaningful relationships with the many people who make CAMP Rehoboth such a vital community anchor.”

Continue Reading

Rehoboth Beach

Rehoboth’s Blue Moon is for sale but owners aim to keep it in gay-friendly hands

$4.5 million listing includes real estate; business sold separately

Published

on

The real estate at Rehoboth’s Blue Moon is for sale for $4.5 million. (Washington Blade photo by Michael Key)

Gay gasps could be heard around the DMV earlier this week when a real estate listing for Rehoboth Beach’s iconic Blue Moon bar and restaurant hit social media.

Take a breath. The Moon is for sale but the longtime owners are not in a hurry and are committed to preserving its legacy as a gay-friendly space.

“We had no idea the interest this would create,” Tim Ragan, one of the owners, told the Blade this week. “I guess I was a little naive about that.”

Ragan explained that he and longtime partner Randy Haney are separating the real estate from the business. The two buildings associated with the sale are listed by Carrie Lingo at 35 Baltimore Ave., and include an apartment, the front restaurant (6,600 square feet with three floors and a basement), and a secondary building (roughly 1,800 square feet on two floors). They are listed for $4.5 million. 

The bar and restaurant business is being sold separately; the price has not been publicly disclosed. 

But Ragan, who has owned the Moon for 20 years, told the Blade nothing is imminent and that the Moon remains open through the holidays and is scheduled to reopen for the 2026 season on Feb. 10. He has already scheduled some 2026 entertainment. 

“It’s time to look for the next people who can continue the history of the Moon and cultivate the next chapter,” Ragan said, noting that he turns 70 next year. “We’re not panicked; we separated the building from the business. Some buyers can’t afford both.” 

He said there have been many inquiries and they’ve considered some offers but nothing is firm yet. 

Given the Moon’s pioneering role in queering Rehoboth Beach since its debut 44 years ago in 1981, many LGBTQ visitors and residents are concerned about losing such an iconic queer space to redevelopment or chain ownership.

“That’s the No. 1 consideration,” Ragan said, “preserving a commitment to the gay community and honoring its history. The legacy needs to continue.” He added that they are not inclined to sell to one of the local restaurant chains.

You can view the real estate listing here.

Continue Reading

Rehoboth Beach

Clear Space Theatre to remain in Rehoboth Beach

New arts center to be built on city-owned land

Published

on

Supporters of Clear Space Theatre posted fliers in 2021 advocating for keeping the theater in town.

Clear Space Theatre Company and the City of Rehoboth Beach have agreed to create a public-private partnership to redevelop city-owned land into a new performing arts center, the theater announced Friday. 

The CSTC board of directors formally accepted the letter of intent from the city on Oct. 23, wrapping up an 18-month process for site selection for its new performing arts center.

With the agreement, Clear Space commits to remaining in Rehoboth Beach, where it has been based since 2010.

Based on the terms of the letter of intent, Clear Space will enter into a land lease of 11 Christian St. after the Cape Henlopen Senior Center relocates to its next home outside the city limits on Hebron Road, according to the announcement. The senior center has been a tenant on city land for 45 years, but was gifted land to expand its operations and will move after the completion of a capital campaign. At that time, Clear Space will begin a lease of up to 50 years. The land, which has been valued at $7.2 million, will be made available to Clear Space for $1 per year. 

The new performing arts center will include a proscenium mainstage, a flexible seating black box, a rehearsal studio, expanded lobby, concessions, and backstage facilities, and gallery space, according to the announcement. Parking will be provided on site

“On behalf of the Board of Commissioners, I am thrilled that Clear Space has selected our offer and plans on staying in the City of Rehoboth Beach,” Mayor Stan Mills said in a statement. “Clear Space has always enriched Rehoboth Beach culturally, socially, creatively, and economically. It is a top-notch performing arts center that is near and dear to our residents, visitors, and business owners. We believe it’s a win-win, and we look forward to many more years of our partnership with Clear Space.”

“We are grateful to Mayor Mills for first proposing that Clear Space consider the site at 11 Christian Street back in March 2024,” said Clear Space Managing Director Joe Gfaller.“Without his encouragement, the site might not have been explored as one of the nine in our 2024 market study. As our analysis winnowed down our preferred sites, the City of Rehoboth Beach’s staff and elected officials were consistently excellent partners, negotiating fairly and transparently in the interest of the citizens, business owners, and visitors of Rehoboth Beach.”

The total cost for the new performing arts center is approximately $40 million, according to the announcement, with a national RFP process for the project’s architect coming soon along with community forums for residents and audiences to follow in 2026.

The development ends years of contentious debate about the location of the new theater complex. In 2021, The Rehoboth Beach Board of Commissioners voted for the second time to overturn a decision by the city’s Planning Commission to approve plans by Clear Space to build a larger theater and adjacent rehearsal theater in a new downtown location.

Supporters of the project expressed outrage at the time over the Board of Commissioners’ 4 to 3 vote to reject the Planning Commission’s approval and deny the Clear Space application to build its proposed new theaters on Rehoboth Avenue, which serves as the city’s main commercial boulevard. The controversy led to speculation that Clear Space could relocate outside of Rehoboth to Route 1 or even to nearby Lewes, Del. 

Continue Reading

Popular